Hafan >> Cynnyrch >> System prawf trawsnewidydd dosbarthu cwbl awtomatig>> System prawf trawsnewidydd NKE-DTTS-AUTO/500

System prawf trawsnewidydd NKE-DTTS-AUTO/500

Nanke Electric 油浸式变压器 变压器检测系统

Cywirdeb gradd 0.05, yn cyd-fynd â safon IEC 60076, yn addas ar gyfer 0.12–1.5kV; Gwblhau'r holl brofion ar gyfer trawsnewidydd gradd uchel 500kVA, 36kV yn awtomatig, heb orfod llunio adroddiadau â llaw, ac mae'n cefnogi addasu cynlluniau.

Manylion cynnyrch

Test Questions:

 1. DC Resistance Measurement

 2. Turns Ratio Measurement

 3. Insulation Resistance Measurement

 4. No-Load Loss Test

 5. Load Loss Test

 6. Inductance Withstand Voltage Test

 7. Power Frequency Withstand Voltage Test

 8. Temperature Rise Test (Optional)

 9. Partial Discharge Test (Optional)

This product includes a distribution cabinet, variable-frequency power supply, intermediate transformer, compensation capacitor, and measurement system, all packed in a 40-foot container.

The overall system design is suitable for the following voltage levels:

Three-phase/Single-phase Transformers

4.16kV transformers have a maximum test capacity of 6,300 kVA, with impedance voltage ranging from 5.75% to 8.0%;

6.9/0.38-2.08kV transformers have a maximum test capacity of 12,000 kVA, with impedance voltage ranging from 5.75% to 10.0%;

13.8 (13.09/13.2/12.47)/0.38-4.16kV transformers have a maximum test capacity of 20,000 kVA, with impedance voltage ranging from 5.75% to 10.0%;

16.34/0.48kV transformers have a maximum test capacity of 20,000 kVA, with impedance voltage ranging from 5.75% to 12.0%;

27 units (24.7/23.0)/0.38-4.16kV transformers have a maximum test capacity of 20,000 kVA. Impedance voltage: 5.75% to 12.0%;

34.5/0.38-13.2kV transformers have a maximum test capacity of 30,000 kVA, with impedance voltage ranging from 5.75% to 12.0%;

Implementation Standard: IEC60076/IEEE C57.12.90-2021

System Measurement Accuracy: Precision Transformer/Power Analyzer with accuracy class 0.05: YOKOGAWA WT500 and above

Use test vehicles to test DC resistance and turns ratio. Wiring is completed once, and data can be uploaded to the regular testing system. No-load, load, inductive withstand voltage, and power frequency withstand voltage tests are all manually wired according to the test procedure, while the computer program automatically completes the tests. After the tests are finished, the results are automatically calculated, and the factory test report is exported.